Skip to content
Plexago
  1. Guides
  2. Day to day

Tracking maintenance and tenant requests

Receive your tenants' requests, follow them until they're resolved, and keep track of your work orders.

Time: 5 minutesIn Plexago: MaintenanceService requests, MaintenanceWork orders

Buttons and fields are quoted as they appear in Plexago's English interface. To switch languages, open your account menu (your initials, top right) and click English / Français.

Where your tenants report a problem

In their tenant portal on the web (Requests tab, Report a problem button) or in the Plexago app, on their phone. Both open with no password, with the lease's invitation code: print the letter with Letter with QR code, in the unit page's Current lease card, and give it to your tenants. The leases guide explains how to open the tenant portal.

A new lease, a new code

The code changes with each new lease, including after a renewal: give the new letter to your tenants.

What your tenant does

They describe the problem in 5 steps: category, room and urgency, a description, up to 6 photos, their availability and whether they allow entry when they're out. They get a reference number (SR-…) and can then follow each step: Received, Assigned, Scheduled, Resolved.

Handle a request

  1. Spot new requests

    The dashboard's To do list shows each new request with the Reply button, and an urgent request already assigned with Schedule. The Service requests tab of Maintenance lists them all, marked Urgent when needed.

  2. Adjust the urgency

    If needed, change the Urgency then click OK.

  3. Assign

    Assign: the Technician / company, picked from the supplier register (or any other name), or the building's janitor, and, if you like, a note for the tenant.

  4. Schedule

    Schedule: the date of the visit and a note (“The plumber will come through the back door”).

  5. Close

    Mark resolved, with a final note. The tenant sees every change as soon as they open the app or their tenant portal.

Tenants notified by text

If a tenant chose to be reached by text when sending their request, they get a text message when their request is assigned, scheduled, postponed or resolved, and when you write them a note. Otherwise, they see updates in the app or in their tenant portal. An urgent request also texts the cell phones ticked under Urgent service request alerts, in SettingsNotifications to management.

Work orders

  1. Create the work order

    In Work orders, click + Add a work order: Building, Description, Assigned to (a supplier from the register, or a person), Requested by, Scheduled date, Amount ($) and Priority (low, normal, high or urgent). For work in a single unit, create it from the unit's page.

  2. Move it forward

    Change the status (To do, In progress, Done or Cancelled) then click OK. Open work orders show on the dashboard.

  3. Enter the invoice

    Once the work is done, Create the expense or Create the supplier invoice on the work order opens the entry already filled in (building, supplier, amount, description) and links the two. It's added to the supplier's record in the supplier register, which your TP-1086 comes from (see Entering expenses).

A tenant request that needs major work? Create a work order too: the two are tracked separately.

What's next?